PreacherJon
Member
This will be my lot in life for a little while. I need to rough out 40 Cherry bowls. And then turn them all to finish by Mother's Day.
The blanks have been sitting in the shop since August and they are down to about 15-16 percent moisture. I think a little over a month bagged inside the house and they should be ready for twice turning.
The blanks have been sitting in the shop since August and they are down to about 15-16 percent moisture. I think a little over a month bagged inside the house and they should be ready for twice turning.